Skip to page body Home City Hall Residents Business Visitors Services Weho TV
Translate
The Engineering Department reviews and approves private developer and public agency improvement plans. The plan review process for water system extensions within Sunrise proceeds as follows:
  • Permitting authority notifies Sunrise staff of development application. 
  • Engineering staff provide direction and guidance on water system extensions based on the pre-application meeting.
  • Applicant submits two sets of engineered plans and drawings to engineering staff for review and consultation with the Fire District on number and spacing of hydrants.
  • Staff comments on the proposal submitted to the consulting engineer for the project.
  • Approval and conditions for construction communicated directly to the consulting engineer along with project cost and fees details.


Submit Plans to:

Tim Jannsen, District Engineer
10602 SE 129th Ave.
Happy Valley, OR 97086


Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader Download Flash Player Download QuickTime Download Windows Media Player Download Microsoft Silverlight Download Word Viewer Download Excel Viewer Download PowerPoint Viewer
Last updated: 1/31/2014 4:24:53 PM