Skip to page body Home City Hall Residents Business Visitors Services Weho TV
Translate


Use links to jump to sections
  Schedule Work Hours & Truck Route 
 Work Flow Site Section 

dark blue green divider

Schedule

My attempt at schedule

bright green divider

Work Hours & Truck Route

Work Hours will be Monday through Friday

7:00 am to 6:00 pm

There will be no weekend work without special approval

Truck Route 051618

Dump trucks will stage on site - No on street staging permitted

light blue divider

Work Flow

In general, progress will proceed along a work flow that includes:

Site Excavation:

  • Grading and rocking site access and haul road
  • Excavation of reservoir site
  • Removal of excavated materials
  • Stabilization and shoring of excavation site

Reservoir Construction:

  • Boring and setting concrete footing pilings
  • Construction retaining wall
  • Install underlayment fabric
  • Installing inlet and outlet piping
  • Leveling engineered fill
  • Forming, tying retaining bar, and pouring floor
  • Forming, tying retaining bar, and pouring walls, support columns, and roof
  • Install vents and hatches
  • Apply cable wrapping
  • Install pumping and mechanical components

Backfill

  • Backfill and rough grade at reservoir 

Final Grading and Sitework

  • Final grading and site preparation of entire two reservoir site
  • Installation of final fencing
  • Coating new Reservoir 11 and re-coating existing Reservoir 6
  • Installation of irrigation system
  • Landscaping work

dark green divider

Site Section

Site section drawing showing post construction ground levels and backfill plan.

Res 11 major site section


Last updated: 5/22/2018 2:42:02 PM